MachineScheduler.com
Built for Job Shops & CNC Machining Centers

Stop Scheduling Your Shop on a Whiteboard.

Visual Machine Scheduler replaces Excel spreadsheets and magnetic whiteboards with a drag-and-drop Gantt board that enforces finite capacity, detects scheduling conflicts in real time, and loads your existing jobs from CSV in under 30 minutes.

  • Launching soon
  • Reserved launch pricing for waitlist members
  • Import from Excel in under 30 minutes
  • No ERP required

Read Free Guides

Production scheduling best practices, OEE calculation tutorials, and Excel-alternative guides — free in our blog.

Browse the Blog

Calculate Your ROI

See exactly how much manual scheduling is costing your shop and which tier pays for itself fastest.

Run the Calculator

Join the Waitlist

Visual Machine Scheduler is opening trial signups soon. Drop your email for early access and a launch-pricing offer.

Join the Waitlist

Most Job Shops Are Running Blind.

If you can't answer these questions right now, you're operating in a scheduling blind spot that's costing your shop real money.

Which machines are loaded right now?

Your whiteboard was updated this morning. Two rush orders came in this afternoon. Now nobody knows the real schedule.

Are any jobs going to miss their due date?

You find out jobs are late when the customer calls — not when you still have time to prevent it.

Which machine has capacity for a rush order?

Figuring this out takes 20 minutes and three phone calls to the shop floor. You either lose the order or commit to a date you can't keep.

What's your on-time delivery rate this month?

You know it's bad. You just don't know how bad — because counting jobs from the whiteboard takes the rest of the afternoon.

The average $2M job shop loses $128,000–$276,000 per year to scheduling inefficiency — missed due dates, unplanned downtime, emergency overtime, and reactive firefighting.

That's 30–65× the annual cost of a Visual Machine Scheduler Professional subscription.

Source: Qlector 2025, Arda Cards 2026, industry benchmarks — see our full analysis.

A Scheduling Board That Thinks Like a Production Manager.

Finite Capacity, Always

Every machine, every shift, every operation — the board enforces capacity limits so you can't double-book a machine even by accident. Conflicts surface at assignment time, not after they hit the floor.

Drag-and-Drop in Seconds

When a machine breaks down or a rush order arrives, drag the affected jobs to available windows. The board recalculates due-date status instantly. What used to take two hours takes five minutes.

Your Jobs, Day One

Import your existing Excel schedule via CSV. Your machines, your jobs, your operators — on a live Gantt board in under 30 minutes. No ERP migration, no consultant, no project plan.

Everything Your Whiteboard Can't Do.

See Your Entire Shop Floor at Once

The Gantt board shows every machine as a row and every scheduled operation as a color-coded block. Day, Week, or Month view. Zoom preference saved between sessions. Due-date color coding — green, amber, and red — updated instantly when you drag any block to a new position.

Catch Conflicts Before They Hit the Floor

Professional+

When two operations compete for the same machine window, a real-time alert fires with the specific job numbers, machine name, and overlapping time. You resolve it in seconds — not after a missed deadline triggers a customer call.

Your Excel Schedule, Imported in Minutes

Upload your existing job list as a CSV. The importer validates every row and returns a per-row error report for anything that fails — but valid rows import immediately, so a formatting issue in two rows doesn't block 198 others.

Print and Post the Day's Schedule

Generate a printable PDF for any machine for any day — job number, customer, operation, estimated hours, and unscheduled gaps. Posted at each station by the start of shift. Professional tier and above: your logo, no watermark.

Know Which Machines Are Bottlenecks

Professional+

Available hours vs. scheduled hours vs. actual completion per machine per week, over a rolling four-week trend. If VMC-3 is running at 91% scheduled utilization, you see it Monday morning — not Friday afternoon when it causes a miss.

A Number You Can Actually Report

Professional+

Jobs completed on or before due date vs. late, over rolling 30, 60, and 90-day windows. By customer. Exportable as a branded PDF. The metric your customers are starting to require as a condition of contract renewal.

From Whiteboard to Gantt Board in 30 Minutes.

  1. Add Your Machines

    Register every machine on your shop floor — name, type, shift hours. Takes 5 minutes for a 20-machine shop.

  2. Import Your Jobs

    Upload your existing Excel schedule as a CSV. The importer handles the rest. Your jobs appear as draggable blocks on the Gantt board.

  3. Schedule and Ship

    Drag blocks to resolve conflicts. Print the daily PDF for the shop floor. Track on-time delivery without counting rows on a whiteboard.

How Much Is Manual Scheduling Costing Your Shop?

A $2M job shop with one production manager spending 4 hours per week on manual schedule maintenance loses an estimated $128,000–$276,000 per year. Calculate your shop's specific number in under 2 minutes.

Preview

20
4
$500

Estimated annual savings

$127,400

Calculate Your Real Number

Start with a Template. Scale to the Full Platform.

Not ready to commit to a subscription? Our Excel and PDF templates let you implement scheduling best practices today — with upgrade paths to the live SaaS tool built into every file.

Machine Utilization & OEE Tracker

Track available vs. scheduled vs. actual hours per machine. Calculate OEE components with auto-populated formulas.

Production Scheduling Gantt Template

A purpose-built Excel Gantt for job shops with up to 20 machines and 50 concurrent jobs. Color-coded by due-date status.

Machine Capacity Planning Workbook

Quantify your exact capacity exposure before committing to new orders. Shift-aware, machine-specific, formula-driven.

Production Scheduling Insights for Job Shop Managers

The first articles are being drafted. Check back soon — or subscribe below to be notified when they publish.

Straightforward Pricing. No Per-Seat Surprises.

Essentials

$199/mo

For small job shops with up to 10 machines.

  • Up to 10 machines, 50 active jobs, 3 users
  • Gantt board, CSV import, finite capacity enforcement
  • Daily schedule PDF, due-date color coding
Join the Waitlist
Most Popular

Professional

$349/mo

For growing shops running 2 shifts on up to 25 machines.

  • Up to 25 machines, 200 active jobs, 10 users
  • Drag-and-drop rescheduling, conflict detection
  • Machine utilization report, OTD report, branded PDFs
Join the Waitlist

Business

$599/mo

For mid-size manufacturers running multiple shifts.

  • Up to 75 machines, unlimited jobs, 25 users
  • Multi-shift scheduling, OEE dashboard, API access
Join the Waitlist

Enterprise

$1,199/mo

For large contract manufacturers.

  • Unlimited machines, jobs, and users
  • SSO/SAML, custom report fields, dedicated success manager
Contact Us

Stop Running Your Shop on a Whiteboard.

Launching soon. Join the waitlist and we'll email you the moment trial signups open — plus a launch-pricing offer reserved for early members.

  • Launching soon
  • Launch-pricing offer for waitlist members
  • Load from Excel in 30 minutes
  • Unsubscribe anytime

Get Weekly Production Scheduling Insights

Join 500+ production managers getting practical guides on OEE, capacity planning, and scheduling best practices.