
EDM and Wire EDM as the Hidden Bottleneck in Mold & Die Scheduling
EDM is slow, expensive, and unattended-friendly. That combination makes it the most-overlooked bottleneck in mold and die scheduling.
Blog
Practical articles for production managers and shop supervisors at SMB job shops and CNC machining centers.

EDM is slow, expensive, and unattended-friendly. That combination makes it the most-overlooked bottleneck in mold and die scheduling.

In most job shops, the bottleneck is a machine. In a mold and die shop, it's a person. Capacity planning has to account for that.

Mold and die shops are the longest-cycle work in machining. A single program can occupy a machining center for 6–14 weeks. Scheduling that is a fundam…

Textbook scheduling assumes you're either high-mix-low-volume or low-mix-high-volume. Real job shops are both, often on the same machine in the same w…

Most missed due dates aren't operational failures — they're quoting failures. A quoter promised a date the shop couldn't keep. Here's how to break tha…

The general job shop is the hardest scheduling problem in manufacturing. Not because of volume but because of variability — every customer ships diffe…

Detroit's mold and die shops feed every tier 1 and OEM in the region. Long-cycle programs (16+ weeks), EDM bottlenecks, and OEM design changes mid-pro…