EDM and Wire EDM as the Hidden Bottleneck in Mold & Die Scheduling
EDM is slow, expensive, and unattended-friendly. That combination makes it the most-overlooked bottleneck in mold and die scheduling.
Blog
Practical articles for production managers and shop supervisors at SMB job shops and CNC machining centers.
Tag
Articles tagged across the MachineScheduler.com blog.
EDM is slow, expensive, and unattended-friendly. That combination makes it the most-overlooked bottleneck in mold and die scheduling.
In most job shops, the bottleneck is a machine. In a mold and die shop, it's a person. Capacity planning has to account for that.
Mold and die shops are the longest-cycle work in machining. A single program can occupy a machining center for 6–14 weeks. Scheduling that is a fundam…
Detroit's mold and die shops feed every tier 1 and OEM in the region. Long-cycle programs (16+ weeks), EDM bottlenecks, and OEM design changes mid-pro…
Mold and die shops live in a strange scheduling space — 12-week new mold builds running alongside 3-day repair jobs. In Chicago-Rockford, that complex…